The Green Street Car Wash

Boudreau Pipeline | Pipeline
Boudreau Pipeline | Pipeline | Storm Drain
Boudreau Pipeline | Pipeline | Storm Drain
Boudreau Pipeline | Pipeline | Storm Drain
IMG_8423.jpg
IMG_8409.jpg
IMG_8427-Edit.jpg
Boudreau Pipeline | Pipeline
Boudreau Pipeline | Pipeline | Storm Drain
Boudreau Pipeline | Pipeline | Storm Drain
Boudreau Pipeline | Pipeline | Storm Drain
IMG_8423.jpg
IMG_8409.jpg
IMG_8427-Edit.jpg

The Green Street Car Wash

$0.00

Project Location:
Mission Viejo, CA

Client:
KPRS Construction

Contract:

$775,000

Add To Cart

Details:

“The Green Street Car Wash", located in Mission Viejo, CA., is a $775,000.00 project for Bergman KPRS Construction. The project scope includes approx.. 2,200 Lf of storm drain, 650 Lf of sewer, 450 LF domestic and fire water, some very challenging offsite sewer and water work, and a massive 121'x21' storm detention unit. As with all our projects, Green Street Car Wash is not without its unique challenges. The project is located directly adjacent Marguerite Ave. and Avery Pkwy. with deep tie-ins and installations on both sides of the very busy intersection. As well, placement of such a large detention basin on a small site like this, really challenges the whole team to pre plan the dig, delivery, placement, and backfill operations with a strong focus on keeping all trades moving forward for the sake of the overall project. Our team's willingness to work together and push through challenges such as these, is a testament to our winning "Can Do" attitude! Once again, undoubtedly carrying us through to completion of another successful project.

Project Details: 

Sewer-bar10.gif